Rubber cold tire retreading for truck

FOB Reference Price:Get Latest Price
US $11,300-16,200 / Set | 1 Set/Sets Rubber cold tire retreading for tractor chamber (Min. Order)
Supply Ability:
5 Set/Sets per Month Rubber cold tire retreading for tractor chamber
Port:
Qingdao
Report Suspicious Activity
Overview
Quick Details
Condition:
New
Place of Origin:
Shandong, China (Mainland)
Brand Name:
HG
Model Number:
cold tire retreading machine
Voltage:
380V,50HZ
Power(W):
7.5KW
Dimension(L*W*H):
3200*2300*1900
Weight:
3TON
Warranty:
6 MONTH
After-sales Service Provided:
Engineers available to service machinery overseas
Color:
According to customer need
Material:
Carbon steel
Curing time:
2.6~3h
Temperature:
95~120℃
Vulcanizing pot pressure:
0.5-0.6Mpa
Packaging & Delivery
Packaging Details
Nude packing rubber cold tire retreading for tractor chamber
Delivery Time
25 days delivery rubber cold tire retreading for tractor chamber

Specifications

1.Rubber cold tire retreading for truck
2.Can do 6,8,12,16,18,24 tires
3.Fine design,high quality

Product introduction                                                                 

 

Rubber cold tire retreading for truck are safe and reliable curing equipment,  this tank chain device  

is the guarantee quality the first points qualified products. 

The equipment is available electricity or steam, heat conduction oil heat. 

Equipment operation in control panel before you can adjust on the pressure, temperature, time.

 

Operation                                                                                  

 

Manual closing, vulcanizing pot after is open, the power is connected by hand motor door-close button, vulcanizing pot began to enter into automatic control.
1) miniature cooling motor startup
2) the circulation fan startup
3) heater or steam heating begin
4) vacuum pump start-up
5) 0.75 M afraid of filtering dry air valve opens(into the cans of compressed air should be no oil dry compressed air) 

until vulcanizing pot pressurized to setting value, to date, heater, self-control after fan,  EPS value to  package sets the set pressure value will suffer. Vulcanizing pot in which meets the above conditions 

launched. After timer General vulcanization time is 2.6-3 hours. Achieve time vulcanizing pot  automatic vent, until the compressed air all platoon 

tank to tank clean, pressure value zero, open the door motor automatically start make pot 

the doors opened, as the entire system without electricity, vulcanization ended.

 

Specification                                                                              

 

1.Tire curing chamber line design and manufacture in strict accordance with the  national standard of steel pressure vessel, and according to the country" pressure vessel safety 

design review project "the relevant requirement of inspection.
2. According to the heating mode can be divided into steam pressure, electrical heating and heat 

conduction oil heating three forms.
3. According to different division control circuit for PLC control and PLC control add touch screen 

display two kinds.

 

Pictures